Everything Is in Order

STAR-2 demonstration reactor construction base.

The construction site was raging with action.

It had been more than a month since Beijing approved fusion ignition. Autumn was gone and Winter had arrived. It was now the season to eat dumplings.

Even though the weather was getting colder, it didn't put out the fire in everyone's heart.

They had crossed countless obstacles and barriers to get to this moment.

Soon, they would find out if it was all worth it.

"Connection port is checked! Connection is normal!"

"Attention all units, start docking!"

The ion cyclotron resonance heating antenna, which was around ten meters long and around four meters wide, was hoisted by a steel cable and attached to a crane. It slowly moved toward the huge reactor.

At the same time, the China National Nuclear Corporation engineers were standing nearby. They were operating other professional equipment and installation work.