Tellurium
Design Crash
The design that was being passed by a customer also stopped to proceed.
"Call the engineer of this design and solve the problem," miss Li instructed, someone brought the engineer and he checked but it was not that design was lacking the blueprint follow up, the problem was with assembly line.
The students were still standing there to see how the problem will be solved, it seemed to work in the manufacturing plant was a tough job.
The project engineer and the manager were standing to check ongoing suspension reason.
Mag was also curious, he was genius he spoke, "Is this possible that the assembly line broke some component and it stopped the procedure immediately," he suggested.
The project manager and the engineer both looked at the student, they understood what he meant but they were surprised that this option did not cross their mind.
It was possible that twenty four hour working assembly line broke some component or damaged any part.