Pipeline

After the first week of work for the Spacol industry, the group assigned to the expansion of their Moon base started running out of crafted parts. A few days later, Keith, Jim and Tyler stocks of metal sheets were totally depleted and the construction of the pipe had to be stopped for the time being.

They had fotunately sent a supply rocket just before embarking onto the 'Triple S', but it did not seem to be enough for the six of them. Their first automatically sent rocket arrived two weeks after they landed on the Moon and their work could resume for good. Since they had turned off their 'Rocket assembler' while they were building the new 'Rocket extender' for the EOSS, there has been a pretty long calibration time for a new rocket to be build in their Earth base before being launched towards their space station.