Working Caterpillar

Wang Che looked at it. This kind of contract naturally could not stump him.

The conditions given by Silkworm Fashion were the same as described.

Even the number of threads required every month was written clearly.

There was not much. It was enough to spit 30 meters of thread a day. Of course, it had to be done continuously.

Otherwise, it would not be easy to process.

This was basically equivalent to letting the green caterpillar practice Spit Thread less than ten times a day.

It also solved the problem of wasting so many threads during the previous practice.

Such threads could only be used normally after processing.

The problem in the contract was that after the green caterpillar grew, the quality of the threads would increase, and the amount provided would increase.

Of course, the workload would also increase appropriately.