Chapter 642: Creating the Brightest Star in the Sky_2

There was good news that day.

The high-level meeting had approved the construction of the high-power Z-wave Generation Satellite, and unsurprisingly, the ownership of the satellite was assigned to Aviation Group and Aerospace Bureau. Yixing Unlimited Power Company was granted 'non-emergency status' full usage rights; however, each use would require a report and be subject to supervision.

After the approval, the high-power Z-wave Generation Satellite could enter the construction phase.

In reality, the construction did not take long, as there were no direct technical challenges. Z-wave satellite technology had matured significantly, and the construction of the high-power device could be completed within a month.

The most critical issue for this project was still at the energy supply end, specifically the manufacturing of the photovoltaic power converters.