Sumei bridge planning_1

"We don't need stones, just cement. Therefore, he had to prepare more wood and scaffolding for the template.

Yiwu, arrange for people to go to Yanling County to purchase wood in bulk.

They were pulled back and sawed into boards, leaving a part of it to be used as a horizontal beam. The top beam was not made of wood, but instead, was made of steel pipes that could be lifted.

Also, move some of the stone and sand crushing machines to the side of the bridge and accumulate a large amount of gravel and sand.

A few huge steel warehouses would be built beside the bridge to store cement, steel bars, and other building materials.

When the time comes, we'll grab hold of it when the tide recedes.

Otherwise, the water won't dry up. " Tang Wen said.

"Don't we have a lot of trees on our Island? Just cut it down directly. " Luo Yiwu said.