Personally Building the Drill Platform (2 in 1)

So it was like this.

Tang Rui nodded after listening.

It seemed that he had previously helped the Sichuan Provincial Oil Group fight for shares, and in return, they had covered all the expenses of the panda.

Thinking about it, it was trivial.

How much could eight pandas cost?

When the seabed oil was extracted, even with only 5% of the shares, the Sichuan Provincial Oil Group would make a fortune.

Tang Rui also sat on the lawn, stroked the panda for a while, and then returned to the laboratory.

He didn't feel any pressure, but the pressure from above was immense.

Therefore, he was prepared to demonstrate some skills first to reassure the higher-ups.

Underwater drilling technology.

This technique was not too difficult for Tang Rui.

Normal difficulty in positioning, seabed geological structure investigation, drilling route selection, and drill bit material were not problems for him.