Operation Reclamation

The memo containing the conservation of electricity has been distributed by the soldiers to all of its residents. With this, non-essential electrical appliances were disconnected or powered down throughout the condominium, leaving only the essential lights and equipment such as water pumps operational. Residents huddled in their units, adjusting to the newfound scarcity of electricity.

From the outside, it was as though the whole building was still on blackout as no lights illuminating the units. It was a good thing considering that zombies could also be attracted to bright places. However, the problem is that the new source of power providing electricity to the condominium were loud generators.

Its loud mechanical noises were attracting zombies from far and near. They rushed as hordes and surrounded the building with no point of exit.