Blackmail

Due to the construction project being a sensitive topic, the construction company didn't ask more about the usage of the sea platform. After they received the upfront payment, they sent the vessels to start building.

The sea platform was the size of two football fields, shaped triangularly. If it were far away from the shore, the difficulty of constructing it would be unimaginable. If it were standard steel, the tide of the ocean would dismember this giant. But if titanium were used, the cost of the construction would be an astronomical number.

However, because it was in a shallow sea with a depth of ten meters, the construction process was a lot simpler. A reinforced steel base could be inserted into the rock bottom of the ocean, making it equivalent to a man-made floating island.

The four vessels were anchored near New Moon Island as they sent out boats to explore the surroundings.