Chapter 853: The New Defensive Line

Dozens of massive war chariots drove out from the rear, directly entering the blasted trench.

These war chariots were all equipped with the latest three-cylinder engine, using high-quality Dao Foundation as fuel, providing robust power. At the front of the chariots were specially designed plows, which, when activated along the trench floor, cleared and leveled the loose soil, creating a wide trench with a flat bottom.

Dozens of engineering vehicles were dispatched simultaneously, each needing to cover less than two miles, and the work could be completed in two hours.

At the same time, thousands of freight trucks surged toward the construction site, each carrying several pre-cast concrete components, which could then be installed in the trench by the Dao Foundation Cultivators.